top of page

Operational Plan of Management

A complete, council-ready Operational Plan of Management with all supporting annexures and a purpose-built evacuation plan, submitted in support of the development application. The operator went from having everything in their head and nothing on paper to a polished compliance document they could put their name to, without having to learn how these documents are written or lose days of work pulling it together themselves.

What I did


I started by building a detailed discovery questionnaire tailored to the business. Rather than asking the operator to somehow know what a council wants, I broke the whole operation down into plain questions covering every area the document would need to address. How materials move on and off site, how stone is stored, what machinery runs and how it's maintained, how silica dust is controlled, where staff and customers park, how the site is secured at night, what happens in an emergency. The questionnaire did the heavy lifting of pulling everything out of the operator's head and onto the page, in their words.


From there I built the document itself. That meant taking a stack of practical answers and shaping them into a structured, professional plan an assessor could move through easily. Every section had to do its job and line up with the other technical reports going in with the application. The operating hours, the employee structure, the vehicle and traffic detail, the silica and chemical compliance, the waste arrangements, the safeguards, all of it organised so a reader never has to hunt for anything.


A lot of the work was turning real-world practice into compliance language. The operator already washed down machinery every Friday, already ran wet-cutting tools with water suppression, already locked the place up a certain way each night. My job was to recognise which of those everyday habits a council actually wants to see documented, and to write them up as the proper controls and procedures they already were. The thinking was on the floor. I put it into the document.


I also pulled together the supporting annexures the plan referenced, so the safety policies, the chemical management material, the storage procedures and the complaints policy all sat together as one complete, submission-ready package rather than a document with gaps where the attachments should be.


The evacuation floor plan

The business didn't have an emergency evacuation plan, which the council needed. So I designed one from scratch.


That meant building a clear, properly labelled floor plan of the site showing the warehouse and office layout, marked evacuation routes, exits, the assembly point, and the location of every fire extinguisher, alarm, first aid station and emergency phone, with a legend so anyone can read it at a glance. It's the kind of thing that has to be displayed on the wall and understood in seconds during an actual emergency, so it had to be simple, accurate and unambiguous. 


I designed it to look professional enough to sit inside a council submission and practical enough to do its real job on the day it's needed.


Why it matters


Most small operators already do the right things day to day. What they don't have is the time, or the patience, to translate years of practical know-how into the language a council assessor expects to read. That translation is the work. I can sit down with an operator, ask the right questions, and turn the answers into a document that holds up under scrutiny, and when something's missing, like an evacuation plan, I can build that too.


For the business owner, it means the compliance side gets handled properly and they get to stay focused on the actual job. If you've got a development application, a council information request, or any operational document that needs to be both accurate and easy to read, I'd love to help.

bottom of page